Operation Breakdown of Linen Trouser

This Linen Trouser is an easy style to produce in the sewing line. It has two front and two back welt pockets. Fabric is light. Here we can learn the operation Breakdown of the Linen Trouser with SMV and Machine names. 

Operation Breakdown of Linen Trousers is done by the following table. In this operation Breakdown process list, estimated time, machine name, hourly production target quantity at 100% and 75% efficiency are shown. The estimated time (SMV) shown in the below table will vary according to the product method followed and machine and equipment used in actual production. So please be careful while you use the above estimated time against each operation.

Monday, December 20, 2021

Operation Breakdown of Linen Shorts

This Linen Shorts is an easy style to produce in the sewing line. It has two front and two back welt pockets. Fabric is light. Here we can learn the operation Breakdown of the Linen Shorts with SMV and Machine names. 

Operation Breakdown of Linen Shorts is done by the following table. In this operation Breakdown process list, estimated time, machine name, hourly production target quantity at 100% and 75% efficiency are shown. The estimated time (SMV) shown in the below table will vary according to the product method followed and machine and equipment used in actual production. So please be careful while you use the above estimated time against each operation.

Monday, December 13, 2021

Operation Breakdown of Swim Trunk

This Swim-trunk is not an easy style to produce in the sewing line. It has two front and one back welt pockets with inside mesh lining and Flap. Here we can learn the operation Breakdown of the Swim-trunk with SMV and Machine names. 

Operation Breakdown of Swim Trunk is done by the following table. In this operation Breakdown process list, estimated time, machine name, hourly production target quantity at 100% and 75% efficiency are shown. The estimated time (SMV) shown in the below table will vary according to the product method followed and machine and equipment used in actual production. So please be careful while you use the above estimated time against each operation.