Operation Bulletin of knit overall is done by the following table. In this operation bulletin process list, estimated time, machine name, hourly production target quantity at 100% and 65% efficiency are shown. The estimated time (SMV) shown in the below table will vary according to the product method followed and machine and equipment used in actual production. So please be careful while you use the above estimated time against each operation.
SL. |
Operation |
Type of Machine |
SMV |
Target 100% |
Target 75% |
1 |
Front Placket Mark |
Manual |
0.25 |
240 |
180 |
2 |
Placket Placement Cut |
Manual |
0.30 |
200 |
150 |
3 |
Placket Fusing Attach |
Manual |
0.25 |
240 |
180 |
4 |
Placket Rolling (Lower) |
SNLS |
0.35 |
171 |
129 |
5 |
Placket Sewing at Body |
SNLS |
0.30 |
200 |
150 |
6 |
Placket Top Stitch |
SNLS |
0.30 |
200 |
150 |
7 |
Placket Facing Sewing (Upper) |
SNLS |
0.30 |
200 |
150 |
8 |
Placket Facing Top Stitch |
SNLS |
0.30 |
200 |
150 |
9 |
Placket Rolling |
SNLS |
0.30 |
200 |
150 |
10 |
Placket Box Stitch |
SNLS |
0.35 |
171 |
129 |
11 |
Placket Edge Overlock |
4T O/L |
0.20 |
300 |
225 |
12 |
Top Back & Front Number Match |
Manual |
0.25 |
240 |
180 |
13 |
Shoulder Join |
4T O/L |
0.30 |
200 |
150 |
14 |
Neck Binding Attach |
3T F/L |
0.50 |
120 |
90 |
15 |
Raw Edge Cut |
Manual |
0.20 |
300 |
225 |
16 |
Binding Tack |
SNLS |
0.25 |
240 |
180 |
17 |
Sleeve Number Match |
Manual |
0.25 |
240 |
180 |
18 |
Sleeve Attach |
4T O/L |
0.60 |
100 |
75 |
19 |
Side Seam Join |
4T O/L |
0.40 |
150 |
113 |
20 |
Sleeve Rolling |
3T F/L |
0.50 |
120 |
90 |
21 |
Raw Edge Cut |
Manual |
0.30 |
200 |
150 |
22 |
Main Label Tack & Attach |
SNLS |
0.30 |
200 |
150 |
23 |
Front Rise Join |
4T O/L |
0.30 |
200 |
150 |
24 |
Pocket Number Match |
Manual |
0.25 |
240 |
180 |
25 |
Pocket Sewing |
SNLS |
0.35 |
171 |
129 |
26 |
Pocket Inner Top Stitch |
SNLS |
0.30 |
200 |
150 |
27 |
Pocket Opening Top Stitch |
SNLS |
0.35 |
171 |
129 |
28 |
Pocket Opening Mark |
Manual |
0.25 |
240 |
180 |
29 |
Pocket Tack |
SNLS |
0.35 |
171 |
129 |
30 |
Pocket Bag Closing |
4T O/L |
0.30 |
200 |
150 |
31 |
Pocket Bag Top Stitch |
SNLS |
0.35 |
171 |
129 |
32 |
Pocket False Sewing |
SNLS |
0.25 |
240 |
180 |
33 |
Back Rise Join |
4T O/L |
0.30 |
200 |
150 |
34 |
Back & Front Number Match |
Manual |
0.25 |
240 |
180 |
35 |
Side Seam Join |
4T O/L |
0.55 |
109 |
82 |
36 |
Inseam Join |
4T O/L |
0.40 |
150 |
113 |
37 |
Bottom Rolling |
3T F/L |
0.55 |
109 |
82 |
38 |
Waist Belt Tack |
SNLS |
0.25 |
240 |
180 |
39 |
Elastic Mark & Cut |
Manual |
0.30 |
200 |
150 |
40 |
Elastic Tack |
SNLS |
0.25 |
240 |
180 |
41 |
Waist Belt Tack With Elastic |
SNLS |
0.40 |
150 |
113 |
42 |
Waist Belt Edge Sewing |
SNLS |
0.35 |
171 |
129 |
43 |
Waist Belt Number Match at Bottom |
Manual |
0.25 |
240 |
180 |
44 |
Waist Belt Attach at Bottom |
4T O/L |
0.50 |
120 |
90 |
45 |
Top & Bottom Number Match |
Manual |
0.25 |
240 |
180 |
46 |
Top & Bottom Attach |
4T O/L |
0.50 |
120 |
90 |
47 |
Bow Loop Make |
3T F/L |
0.20 |
300 |
225 |
48 |
Bow Make |
Manual |
0.25 |
240 |
180 |
49 |
Bow Attach |
SNLS |
0.20 |
300 |
225 |
50 |
Bow Bartack |
B/T |
0.15 |
400 |
300 |
51 |
Placket Hole Placement Mark |
Manual |
0.25 |
240 |
180 |
52 |
Placket Hole |
BH |
0.30 |
200 |
150 |
53 |
Thread Cut |
Manual |
0.60 |
100 |
75 |
54 |
Band Sewing |
SNLS |
0.30 |
200 |
150 |
55 |
Band Turn |
Manual |
0.25 |
240 |
180 |
56 |
Band Tack |
SNLS |
0.25 |
240 |
180 |
57 |
Elastic Mark & Cut |
Manual |
0.30 |
200 |
150 |
58 |
Elastic Put At Band |
Manual |
0.25 |
240 |
180 |
59 |
Elastic Tack |
SNLS |
0.20 |
300 |
225 |
60 |
Band Mouth Close |
SNLS |
0.25 |
240 |
180 |
|
Total |
|
18.95 |
|
|
Full form of Machine Name:
In the above table a short name of sewing machines is written. Followings are the abbreviation of those short machine codes.
SNLS - Single needle lock stitch
B/T - Bartack
3T F/L - 3 Thread Flack lock
4T O/L - 4 Thread over lock
Manual - Helper
Set the line target:
It will be best to set the line layout target base on line efficiency, line cost and delivery date of style.
Formula to set the 100% target:
Daily Target = (Worker x Working hour x 60/ SMV) x efficiency %
Basic Pitch Time (BPT) =Total SMV / Total Manpower
We can use “Ball Point or Sharp Point" needle to stitch this item.
Fabric Types and Needle Size Chart:
Fabric Types |
Needle Size |
Very fine fabrics (silk, chiffon,
organza, voile, lace) |
8, 9, 10 |
Light weight fabrics (cotton,
heavier silks, synthetics, spandex, lycra) |
11, 12 |
Operation Bulletin makes our work easy to set up a production line in the apparel industry. We can easily manage machine and operator requirements for any sewing line by this. But it is necessary to do an operation breakdown to prepare a machine layout and line balancing by industrial engineering (IE).
Visit here to know what operation breakdown is. You can visit my post to learn more about the bulletin or breakdown of garments in the garment industry.
Thank you for your patience for reading my blog post. Please, Share this article with others. It will inspire me to write more about this. If you have any advice let me know as a comment.
"Wear a mask to save lives. Clean your hands. Keep at a safe distance."
No comments
Please let me know if anything needs to be added